Web Development Timeline: How Long Does It Take to Build a Website?

Web Development Timeline: How Long Does It Take to Build a Website?
Category
Table of content

When discussing the web development timeline, one of the most common worries customers have is, “How long will this take?” To answer this question, you must understand which phases it goes through to develop a website or web application

Now, the majority of companies, irrespective of the industry in which they are working, are focusing all of their attention on creating a website that is aesthetically pleasing and highly functional. The purpose? To increase sales of their goods and services. 

But coding is not the only step in building a website. There are a hundred distinct aspects that need focusing on, including planning, designing, and testing. This adds to the time needed to develop the website.

How? Let Designveloper address it in the next section.

Typical web development timeline by phase

Typical Web Development Timeline by Phase

When it comes to the web development timeline, there are various important milestones to consider. 

In this section, we’ll show you all of the steps to make a website. This list will give you ideas of what might happen at each stage of the web development timeline.

1. Planning & Requirements (1–2 Weeks)

This phase is the foundation for the entire project. It usually lasts anywhere from one to two weeks and often includes the following:

  • Gathering information

This is crucial, as your developers won’t be able to give you the right solution if they don’t know what they’re working on and what the requirements are. This involves identifying what the website is meant to achieve and learning about the target audience (e.g., who they are, their needs, and how they will interact with the website). 

  • Determining the site architecture and functionality

This includes mapping out the site’s architecture and deciding on the features that you need to integrate to meet business and user needs.

  • Establishing technical requirements and constraints

Take into account all the technological aspects and constraints that could impact the website’s performance. Further, your team should understand how SEO ranking factors tie into these technical requirements to create a functional and optimized site for search engines.

  • Building a sitemap and wireframes

Once the data is in and the requirements feel clear, your team starts mapping things out with a sitemap. It shows how the website is broken down into sections and smaller topics, page by page. 

From there, your team moves on to wireframes, mainly to make sure everyone – especially the client – is on the same page. Wireframes are simple visual layouts of the user interface with no colors or visual details. They help answer practical questions early, like “Does this flow make sense?” or “Is this feature even needed here?” 

  • Decide the right tech stack (e.g., programming languages, frameworks, and content management systems)
  • Estimate realistic timelines with clear deliverables for the project
  • Allocate resources and assign tasks to team members based on their skills and expertise

2. UI/UX Design (2–4 Weeks)

After the strategy and planning stage, the web development timeline will then move on to the design phase, based on the creative brief and the information gathered in the strategy stage. This phase often lasts anywhere between two to four weeks.

In this stage, you proceed to show mockups of the design for feedback. Design mockups can show how the homepage looks, how multiple internal pages look, how the desktop looks, and how the mobile looks.

In the web design process, you also start working on the wireframe created in the first stage. The wireframe is turned into things like buttons, tabs, menus, dashboards, color schemes, typography, and graphics to build the website’s main structure.

Design a website that is easy to use and interactive. It should consider what you learned from your research on your ideal customers and meet their needs and preferences. 

Make sure that you do not make web design mistakes. So your website or web app will never get boring for those who use it. 

Add pictures, colors, and other media types to your website to get more people to visit it. But you have to be careful not to change your website’s brand or its primary purpose. 

These steps require your team to have basic web design skills to make it work. Besides, your team needs to look around to find out the idea from web design trends!

Recommended reading: Website Design in Vietnam: What’s in it for you?

3. Development Phase (4–12 Weeks)

Development phase

Once the design has been approved and validated, the project will proceed to the development stage. This is when the website comes to life, and all parts come together to make a high-quality site. This phase occupies the most significant part of the web development timeline, from four to 12 weeks. 

There are usually two things that web developers consider in this stage:

  • Front-end Web Development

When you go to a website, everything you see, click on, or use in any other way is the work of a developer who specializes in the front end. 

One main job of a front-end developer is to ensure that site users can easily interact with the page they are viewing. Accordingly, they use front-end web development tools to add functions and features to a website’s basic structure. Technically speaking, they code the website’s look using a combination of design, technology, and programming. They also take care of any bugs that may need to be fixed.

  • Back-end Web Development

The back-end is about coding the instructions that make each piece do the tasks that have been given to it. To be more precise, when we say “back-end development,” we mean “development on the server-side.” 

At this point in the process, the most important thing is to keep track of how well the website is doing, find places where it could be better, and make any needed changes. 

Back-end web development usually has three parts: a server, an application, and a database. A website consists of these three parts that work together. 

Accordingly, back-end developers are in charge of writing the code that lets the browser get the information from the database and get “behind-the-scenes” work done on a website’s servers.

Recommended reading: Top 18 Web Development Companies in Vietnam

4. Testing & Quality Assurance (1–3 Weeks)

After the website has been built, it goes through many tests to find and fix any bugs. ​​In the quality assurance (QA) process, your QA team uses repeated testing methods like:

  • Unit testing
  • Stress testing
  • Integration testing
  • Load testing to determine how well the web application works
  • How easy it is to use, how compatible it is, and how well it works

In addition, there is something called the beta stage of testing. Accordingly, you give the clients the option of sharing the website with the right people for review and feedback in a place that requires a password.

Project consistency is another focus area in this phase of the web development timeline. Your team ensures that all features adhere to predefined rules and intended behaviors. 

Besides, your team can consider testing small but crucial aspects such as plugins and SEO optimization. 

The QA team, developers, and designers collaborate closely. They repeat the test-and-fix cycle until they find the website ready for deployment. This phase, accordingly, takes one to three weeks. 

But here’s our pro tip: Start the testing process early by integrating it into earlier stages, like wireframing. This helps you avoid major changes later on, reduces the need for multiple iterations of testing, and saves time.

5. Deployment & Launch (1 Week)

When your QA team gives a website their stamp of approval, the site has passed the testing phase or beta testing phase and is now ready to be used. Depending on what the client needs to do, launching a product can be fast, straightforward, or complicated. But it often takes around one week.

6. Maintenance & Post-Launch Improvements (Ongoing)

Launching is not the end of the web development timeline because maintenance is still to be done. There are many parts of hosting, content creation, and web security that you can think as maintenance tasks and they need to be done regularly. 

Through the constant feedback you get from user interactions, you can learn about potential areas that should be improved. This phase also follows the development life cycle to make and track any changes easily.

For many businesses, handling this phase in-house isn’t always realistic. That’s why some choose to work with outsourcing partners like Designveloper. Not just for custom development, but for ongoing maintenance too. The idea is fairly simple: let specialists deal with updates, patches, and performance tweaks, while the internal team stays focused on other priorities.

Outsourcing website maintenance can feel like a big decision at first. Still, it often pays off. You get access to dedicated expertise, faster responses when things break (because they usually do), and a website that stays secure and functional instead of slowly falling behind.

Web Development Timeline by Website Type

Time to build different website types

You may ask, “So, how long does it actually take to build a landing page or a full-blown e-commerce site?” The answer is: it depends. 

Web timelines extend or shrink based on your site’s purpose, the tech stack, and other factors. Let’s take a glance at how long different websites of all sizes:

Simple Website (Landing Page / Blog)

Estimated timeline: 1 – 3 weeks

This is the fastest category, generally speaking. A simple website, like a landing page or a basic blog, has one clear job: Capture leads, share content, or explain a product.

Most of the time, these sites include:

  • A handful of static pages
  • Minimal design customization
  • Basic forms or CTAs
  • A CMS setup, often WordPress or something similar

The timeline here depends less on development and more on preparation. Is your content ready? Or does your business finalize brand assets? 

There’s also a common misconception that “simple” means instant. It doesn’t, because even a clean landing page needs design decisions, layout tweaks, and testing across devices. These steps seem small, but they add up. But, compared to other projects, this one moves at a pretty comfortable pace.

Recommended reading: The Basics of a Good Web Design Firm: What To Look For

Business Website / Corporate Site

Estimated timeline: 4 – 8 weeks

This is where things start to feel more complicated.

A business or corporate website usually represents an entire organization, not just a single idea. That means more pages, more stakeholders, and well, more feedback. 

Typical features include:

  • Multiple service or product pages
  • Custom UI elements
  • Contact forms, integrations, maybe a blog
  • SEO-friendly structure
  • Brand-aligned design (which can take time to agree on)

The design phase alone can stretch longer than expected. Not because designers are slow, but because reaching a consensus between different parties (e.g., marketing and leadership) takes effort. 

Development itself is fairly straightforward, but reviews, revisions, and approvals often shape the timeline more than code does. If communication is smooth, the process feels steady. If not, things pause, restart, and pause again.

E-commerce Website

Estimated timeline: 2 – 4 months

E-commerce sites themselves are quite complicated, with tons of features behind the scenes, like:

  • Product catalogs and variants
  • Payment gateways
  • Shipping rules and tax logic
  • Inventory management
  • User accounts and order tracking

Each feature introduces risk. They, therefore, require a lot of testing to ensure everything works as intended and securely, even when the site has to handle increasing user requests in peak hours. 

Small e-commerce stores can launch faster, especially if they use platforms like Shopify or WooCommerce. But once customization enters the picture – think of custom checkout flows, third-party integrations, and unique promotions – the timeline extends.

Also, content matters here more than people expect, from product descriptions, images, and policies. Missing one piece can slow everything else down. 

Custom Web Application

Estimated timeline: 3 – 6 months (or more)

Think of a custom web application as a task-driven system. Google Docs, Gmail, Canva, or anything you use everyday to perform specific tasks – they are typical examples of web apps.

Because of that, the timeline for a web app may be longer than a traditional website.

Every single phase requires a higher level of focus and effort. From discovery and technical planning to UX flows and backend architecture, all involve tons of “invisible” work. You might think you’re just adding a login button, but underneath that is a whole web of security protocols, database queries, and error handling to make sure the site actually works like it’s supposed to. 

Because of this, timelines for web apps are often broken into phases rather than fixed end dates. One way to make it quicker is to launch MVP first and make improvements later. 

Recommended reading: Top 10 Web Design Agencies in the World

Factors That Affect Web Development Timeline

Factors affecting web development timeline

But in practice, timelines are significantly impacted by a mix of various factors:

  • Project complexity

A simple site with clear requirements definitely takes much less time than a complex one. 

Websites with complex requirements and advanced features often demand more workflows, efforts, and time in each phase of the web development timeline. 

  • Feature Requirements

Similarly, basic features require less time for development. Meanwhile, advanced functionalities, like a multi-step form with validation, custom logic, and integrations, are definitely not quick. 

  • Team size & experience

More people in a project will not definitely move it faster. Sometimes, a small group of senior developers can move at a frightening speed, as communication, decisions, and feedback loops are just easier. 

Besides, experience truly matters. A seasoned team can plan an architecture, code features, and spot issues faster than a junior team. This translates to less rework and faster time-to-market.

  • Client feedback speed

This factor is often underestimated, but it’s one of the biggest timeline drivers.

Development often moves in loops, including building, reviewing, adjusting, and repeating. When feedback comes quickly and clearly, those loops stay small. But when your team has to wait a week for approval and multiply that time by several stages, the development time stretches out.

  • Technology stack

Using a well-known CMS or framework can accelerate development, as patterns are familiar and tools are ready. But custom stacks often require more setup, more testing, and more problem-solving along the way.

  • Third-party integrations

If API integrations go differently from what’s planned, this can add to the time for handling them. The more third-party tools a website relies on – payment gateways, CRMs, analytics platforms – the more dependencies enter the timeline. Not to mention that it takes longer if developers have to build and deploy custom APIs to integrate your legacy infrastructure.

How to Shorten Your Web Development Timeline

How to shorten web development time

You definitely want to reduce the web development timeline without sacrificing quality. Honestly, most teams want the same. So, take the following tips: 

  • Clear requirements upfront

Clear requirements act like a map before a road trip. Without one, you’ll still move, sure, but expect wrong goals, develop unnecessary features, and set unclear priorities. Clarifying project requirements upfront means less time redoing work. 

  • Fast feedback cycles

Delays in feedback and approval add up to your web development timeline. Quick feedback allows your team to adjust instantly.

Short feedback loops – let’s say daily check-ins, weekly reviews, or quick approvals – can remove weeks off a project. 

  • MVP-first approach

Trying to build everything at once isn’t a good idea. Especially if the market shifts, your business changes direction mid-project, or user demands change, all can make your web project change, adding or removing some features. 

So if you build the “full” website, it doesn’t actually meet ever-changing requirements and your team ultimately has to spend more time reworking. 

So, why don’t you start with an MVP? Just focus on core features first. This allows your team to reduce scope creep, launch faster, and then make later improvements based on real feedback.

  • Reusable components

You want a unique website that reflects exactly your brand voice. But it doesn’t mean your team has to rebuild everything from scratch every time. 

Reusable components – design systems, shared UI elements, existing modules – remove a lot of repetition from the process. They plug in what already works and move on.

  • Experienced development team

Experience changes timelines a lot. Why? Seasoned teams spot issues early by asking better questions and foreseeing potential hurdles to prevent delays before they happen.

It’s not that junior teams can’t deliver. Seasoned developers tend to move with fewer stops, rewrites, and unexpected events. 

FAQs About Web Development Timeline

How Long Does a Typical Web Development Project Take?

According to Clutch, a typical web development project takes around nine months. But that’s just an average figure. You still have to look at various factors we discussed above to assess the real timeline. 

A basic website with clear goals and ready content might wrap up in 3 – 4 weeks. A more involved business site usually lands somewhere around 1 – 2 months. Custom platforms and feature-heavy builds can stretch well beyond that. Let’s say three to six months or longer. 

If you struggle to estimate the web development timeline, why don’t get consultation from Designveloper? 

As a leading software and web development company in Vietnam, we pride ourselves on delivering high-quality services to our clients, helping them grow their business at a world-class level. Our extensive experience in web development has allowed us to refine our project timeline, ensuring efficient and effective results. Some successful projects we have implemented include Lumin PDF, Swell & Switchboard, and Walrus Education.

With years of experience in projects of all sizes and industries, we adopt different estimation techniques, like analogous estimation or Planning Poker. These approaches help us give a nearly precise estimation in timeline and even cost. 

Contact us now for a detailed estimation!

Can a Website Be Built in 30 Days?

Realistically yes, but if your web project has clear requirements, minimal revisions, feedback loops, and less customization. 

If you try to cram a complex, custom build into 30 days, the outcome is usually a disaster. So, 30 days to build a website is possible, but it’s best suited for simpler projects or MVP-style launches.

Why Do Custom Websites Take Longer?

The simple answer is because your team has to customize many features and functionalities instead of using all pre-built components. 

Unlike template-based sites, custom builds require more back-and-forth to ensure that designs, features, and logic will fit your brand voice and specific requirements. 

Also published on

Share post on

Insights worth keeping.
Get them weekly.

Let’s talk about your project
What's type of your projects?
dsv logo
Verified by
https://www.designveloper.com/wp-content/uploads/2024/05/verify-by-3.png
https://www.designveloper.com/wp-content/uploads/2024/05/verify-by-1.png
https://www.designveloper.com/wp-content/uploads/2024/05/verify-by-4.png
https://www.designveloper.com/wp-content/uploads/2024/05/verify-by-2.png
DMCA.com Protection Status